For that reason, the metro authority needed to evacuate the persons, bringing about substantial delays and slow improvement in the construction in the metro railway in that space.[167] The fares in the metro depends upon the gap travelled. The subsequent expenses are applicable for passengers as The 2 lines are https://railway-kolkata57777.smblogsites.com/33210648/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf