The 25mm thick heavy metal tube is driven While using the finish closed by a steel shoe. On reaching the necessary driving resistance, a complete duration cage is lowered in towards the tube and full of high slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://castinsitupiles93233.activablog.com/31825642/cast-in-situ-piles-in-dhaka-options