The main park includes a capability of two hundred MW while Sandrini II provides a capability of a hundred MW. The full expense of both projects were not disclosed nevertheless, in the course of design, about two hundred personnel were being utilized. The projects are anticipated to view a handful https://solarcompanyvisaliaca.blogspot.com/